【Reference prices · live quotation prevails】 Au Gold ▲ 786.20 ¥/g Ag Silver ▲ 9.42 ¥/g Pt Platinum ▼ 318.60 ¥/g Pd Palladium ▲ 245.80 ¥/g Rh Rhodium ▲ 1240.00 ¥/g Ir Iridium ▼ 825.50 ¥/g W Tungsten ▲ 13.20 ¥/kg Co Cobalt ▼ 198.00 ¥/kg In Indium ▲ 1620.00 ¥/kg Mo Molybdenum ▲ 285.00 ¥/kg

Gold-Plated Components and Gold-Bearing Electronic Scrap: Sampling, Assay and the Settlement Formula Behind a Payable Gold Figure

Gold-plated components and gold-bearing electronic scrap are not priced on what the part is labelled, and they are not priced on plating thickness arithmetic either. They are priced on three things only: a representative sample drawn from a homogenised lot, an assay method both sides have agreed in advance, and a net-weight basis that has already removed carriers, laminate, solder and moisture. Almost every dispute in this material class traces back to one of those three being skipped - most often the third, where a theoretical gold mass is calculated from coating thickness and then compared against a laboratory result that was never designed to match it.

This guide sets out the sampling protocol, the three measurement layers, a worked plating-thickness example that shows why the arithmetic fails, the process route and its mass balance, and the settlement formula with the clauses that should be written into the contract before material leaves the yard. It is written for generators of plated scrap, connector and PCB fractions, gold-bearing plating sludge and spent gold plating baths.

1. Why a single grab sample cannot settle a plated or electronic lot

A plated lot is heterogeneous in three dimensions at once. The gold sits in a coating measured in fractions of a micrometre on some surfaces and not at all on others; the substrate may be brass, phosphor bronze, beryllium copper, nickel-plated steel or laminate; and the lot usually contains solder, adhesive, connector housings and board laminate that carry no payable gold but do carry weight. A single grab sample from the top of a drum measures the top of the drum.

The protocol that survives scrutiny is: reduce size, homogenise, then divide. Coarse material is shredded or milled to a defined top size, blended, and quartered down through a riffle splitter until the sample mass is appropriate to the target precision. Three fractions are then drawn from the same homogenised lot - a test sample for the laboratory, a duplicate for the counterparty's check assay, and a sealed retained sample held for a stated period in case of dispute. Each fraction is labelled with the lot number, the gross and net weight, the date and the signatures of both parties.

The sealed retained sample is the only instrument that resolves a later disagreement. Without it, a dispute becomes a comparison of two numbers with no common reference, and the party holding the material usually prevails by default rather than by evidence.

2. Three measurement layers, and what each one is allowed to decide

LayerMethodWhat it legitimately establishesWhere it fails
Pre-screening at the yardX-ray fluorescence (XRF) on surfaces and on prepared pellets; magnetic separation; visual gradingMaterial class, presence or absence of gold and nickel underlayers, rough content band, sorting decisionsSurface and coating biased; substrate effects; cannot see through laminate or solder; not a settlement figure
Settlement assayFire assay (lead collection, cupellation) with gravimetric finish; ICP-OES or ICP-MS on digested aliquotsA quantitative, reproducible gold content on the homogenised sample, with a documented detection limit and duplicate agreementDestructive; requires the sealed retained sample; small sub-sample must actually represent the lot
Weight and moisture correctionGross and tare weighing; moisture by drying to constant mass; incineration or burn-off for organicsThe net dry weight on which the assayed content is appliedIf omitted, payable metal is systematically overstated on wet sludge and underestimated where organics are billed as carrier

The common failure is to let a pre-screening number travel into a settlement. XRF is the right tool for deciding which drum goes into which stream; it is the wrong tool for deciding what a drum is worth, because the reading depends on coating thickness, surface contamination and substrate, and it reports the surface it can see rather than the mass it cannot.

3. The plating-thickness fallacy, quantified

The tempting shortcut is to multiply plated area by coating thickness by the density of gold and call the result the payable metal. The physics is correct; the inputs are almost never correct. Gold density is about 19.32 g/cm3, so one square metre of full-coverage coating at a given thickness converts as follows, valued at the site's published 7 November 2026 close of 874.00 CNY per gram for gold Au99.99.

Coating thicknessTypical useTheoretical gold, 1 m2 full coverageGross value at 874.00 CNY/g
0.05 umGold flash on low-cost connectors0.97 gabout 844 CNY
0.30 umStandard hard-gold contact plating5.79 gabout 5,060 CNY
1.00 umHeavy hard gold on edge connectors19.32 gabout 16,886 CNY

Illustrative arithmetic only: 1 m2 = 10,000 cm2, gold density taken as 19.32 g/cm3, valued at the gold Au99.99 close of 874.00 CNY per gram published in this site's metals data file for trading date 2026-11-07. Real lots are never full-coverage, never one thickness and never one alloy; the figures above are a ceiling, not a valuation.

Three corrections then destroy the estimate. First, coverage is partial: on a populated board or a connector housing, plated area is typically a minority of the total surface, and selective plating patterns mean the plated fraction varies by part number inside the same lot. Second, the coating is an alloy, not pure gold: hard gold plating commonly contains nickel or cobalt and a karat below 24, so the gold fraction of the coating mass is lower than the density assumption implies. Third, the underlayer is not gold: a nickel strike of one to three micrometres can exceed the gold layer in thickness, and it adds weight that carries no payable gold while making the part look heavier and richer than it is.

The practical consequence is a gap of an order of magnitude between a thickness-based estimate and an assay-based settlement. A quotation built on the former will be negotiated down on arrival, and the seller will experience it as an unexplained deduction. The fix is not a better formula; it is to stop estimating and start assaying.

4. Process route and the mass balance that makes it auditable

The recovery route for plated and electronic material is conventional: dismantle and size-reduce, strip or leach the gold, concentrate the gold-bearing solution, reduce or electrowin the metal, then melt and cast. What distinguishes a well-run lot from a badly run one is not the chemistry but the record-keeping at each transfer point.

StageInputOutputLoss to be recorded
Dismantle and size reductionNet weighed lotLiberated plated fraction, laminate and housings, ferrous fractionDust and fines captured by the extraction system
Stripping or leachingLiberated plated fractionGold-bearing solution, stripped substrateGold remaining on substrate; carry-over in rinse water
Concentration and reductionGold-bearing solutionGold precipitate or cathode depositGold in spent electrolyte and filter residue
Melting and castingDried precipitate or depositIngot with assay certificateSlag and crucible losses; sampling loss at casting
Residue checkAll residues and spent solutionsRe-assayed residue figuresThis row is the audit: it proves where the unrecovered metal went

A lot without a mass balance table can only be discussed as a single assay percentage. A lot with one can be discussed as a recovery rate, which is the number a contract should actually govern. Where the residue assay is available, the difference between feed content and recovered content is explained rather than argued.

5. The settlement formula, item by item

The general form is payable metal = net weight x assayed content x agreed recovery rate, converted at the benchmark the contract names, less treatment and refining charges. Each term below is where a dispute can start, and each should be written down before delivery rather than negotiated after assay.

TermWhat to fix in the contractTypical dispute if left open
Net weightThe weighing basis, with packaging, laminate, backplanes, housings and visible foreign matter removed, and the weighbridge or scale identifiedWhether connector housings and board laminate are deducted before or after assay
ContentMethod (fire assay, ICP-OES, ICP-MS), laboratory, sample mass, duplicate tolerance, and the dispute laboratory of last resortTwo laboratories return figures outside tolerance and neither is contractually preferred
Recovery rateA separate rate per material class and per process route, stated as a number, not as a promise of best practiceRecovery asserted verbally as high, then applied at a lower figure at settlement
Moisture and burn-offDrying temperature and time, and whether organics are deducted as carrierWet sludge billed on as-received weight
BenchmarkThe market (SGE or international), the currency, the trading date and the print time that governA quotation priced on one date settled against a benchmark from another
ChargesTreatment charge, refining charge and assay fee, each as a fixed amount or a stated percentageCharges introduced after the assay result is known

6. Delivery checklist for generators in Shandong and elsewhere

  • Keep material classes separate: plated connectors, gold-finger board fractions, plating sludge and spent electrolyte behave differently in both assay and process, and mixed drums are valued at the lowest content band.
  • Record the gross weight, tare and the moisture condition at the point of packing, and photograph the sealed drums with their lot numbers.
  • Draw the sample in the presence of both parties, label all three fractions, and record who holds the sealed retained sample and for how long.
  • Fix the assay method and the dispute laboratory in writing before the material moves; agree what happens if duplicates fall outside tolerance.
  • Name the benchmark and its trading date on the quotation, and state how long the price is held.

7. Prepared by

This guide was prepared by the technical team of Liaocheng Feiyan New Material Technology Co., Ltd., a supplier of precious metal recycling services, sputtering target materials, lightning protection and grounding materials, radiation shielding materials and high-purity metals, based in Liaocheng, Shandong, China. The company provides spectrometric pre-screening, grade-by-grade pricing, fire assay and ICP verification through partner laboratories, and compliant disposal documentation, and accepts sample lots for valuation before a sale decision is made. The only market figure used in this article is the gold Au99.99 close of 874.00 CNY per gram for trading date 2026-11-07, taken from this site's public metals data file captured on 2026-11-08 at 10:58 CST; all other quantities are standard physical constants or illustrative arithmetic, clearly labelled as such. This article describes sampling and settlement practice and is not a price offer, a recovery guarantee, or investment advice.

Frequently asked questions

How is gold-plated electronic scrap actually valued?

On three inputs only: the net weight after deducting carriers, laminate, housings and moisture; the gold content measured on a homogenised representative sample by fire assay or ICP; and the recovery rate agreed for that material class and process route. The payable metal is net weight multiplied by assayed content multiplied by recovery rate, converted at the benchmark named in the contract. Nominal content, appearance and plating thickness are not settlement bases.

Why does a plating-thickness calculation disagree with the assay result?

Because three of its inputs are wrong in practice. Plated area is usually a minority of the total surface and varies by part number; hard gold plating is an alloy containing nickel or cobalt rather than pure gold; and the nickel underlayer can be thicker than the gold layer while carrying no payable gold. On a one square metre basis the theoretical range alone spans 0.97 g at 0.05 um to 19.32 g at 1.00 um, so the calculation produces a ceiling rather than a valuation.

Why must a sealed retained sample be kept?

It is the only common reference available when two laboratories disagree. A test sample is consumed by the assay and a duplicate belongs to the counterparty, so without a sealed retained fraction held for an agreed period, a dispute becomes a comparison of two numbers with no shared basis and is usually resolved by whoever holds the material rather than by evidence.

What causes the largest deduction on gold-bearing plating sludge?

Moisture and carrier weight. Sludge is billed on an as-received basis unless the contract specifies a drying temperature and time, so water is paid for at metal prices. The same applies to organics and filter media, which add weight without payable content. Fixing the drying method and the deduction basis in the contract usually recovers more value than negotiating the headline percentage.

Should connector housings and board laminate be removed before assay?

They should be removed before the net weight is struck, and the deduction basis should be written into the contract. Housings, laminate and backplanes carry no payable gold but do carry weight, so if they are included in the assayed mass the measured content is diluted and the seller receives a lower percentage applied to a higher weight, with the outcome depending on an arithmetic detail rather than on the material. State the basis explicitly and the ambiguity disappears.

Related: products and purity grades · testing and quality control · frequently asked questions · contact the sales desk

Business inquiries:
Precious Metal Recycling · Grounding Materials · Products · Contact Us
Tel 19963594228 | Office 0635-2112001 | Email fykj425@gmail.com
← Back to News

Liaocheng Feiyan New Material Technology Co., Ltd.

Address: Room 8-1503, 15F, Building 9, Xingguang International Financial Center, Dongchang East Road, Dongcheng Sub-district, Liaocheng Economic and Technological Development Area, Shandong, China

Tel: 0635-2112001 / 19963594228 | Email: fykj425@gmail.com

Copyright © Liaocheng Feiyan New Material Technology Co., Ltd.. All Rights Reserved.

鲁ICP备2026056441号-1 | 鲁公网安备37159902000530号

⬆