Short answer: on 22 October 2026 China's Ministry of Industry and Information Technology, jointly with seven other departments, issued the Industrial Foundation Capability Enhancement Plan for the 15th Five-Year Plan period. The plan takes industrial base upgrading as its main line and the industrial base re-engineering programme as its operating instrument, and organises its work around closing weak links, extending existing strengths and positioning in frontier areas. For precious and rare metal recyclers the practical meaning is that secondary resources move nearer the centre of national materials security. Refining capability for platinum-group metals, indium, germanium, gallium and rhenium sits squarely in the weak-link category, assay and settlement standardisation becomes the visible near-term deliverable, and the compliance gap between qualified refiners and unlicensed traders widens.
The second thing to say is that policy and price should be read on separate lines, and this session proved it. On the same day that the plan was issued, the Shanghai Metals Market (SMM) midday review of 22 October 2026, Shanghai Metal Exchange spot rare and precious metal quotes of the same day, and China Rare Earth Industry Association reference prices dated 21 October 2026 recorded platinum futures down 2.53% and palladium futures down 3.88% at the midday close, while rhodium powder was unchanged and iridium powder rose 70 RMB per gram. Prices fell; policy improved. Anyone who waits for the two to agree will wait a long time.
Liaocheng Feiyan New Material Technology Co., Ltd. reads the plan as reinforcing a rule that was already correct commercial practice: assay rather than assume, benchmark against a published quote rather than an internal number, and write the settlement date and the recovery rate into the contract before the material moves.
The table below reproduces the figures published for 22 October 2026. Note that within a single precious-metal basket, four metals went three different directions on one day. This is the strongest available argument against pricing mixed PGM scrap on a blended basis.
| Metal / contract | Level or range | Move on the day | Source |
|---|---|---|---|
| Platinum main futures contract | — | −2.53% | SMM midday review, 22 Oct 2026 |
| Palladium main futures contract | — | −3.88% | SMM midday review, 22 Oct 2026 |
| COMEX gold | — | −0.90% | SMM midday review, 22 Oct 2026 |
| COMEX silver | — | −2.09% | SMM midday review, 22 Oct 2026 |
| Platinum 99.95% spot | 390–395 RMB/g (mid 392.5) | −10 RMB | Shanghai Metal Exchange spot, 22 Oct 2026 |
| Palladium powder 99.95% spot | 250–255 RMB/g (mid 252.5) | −9 RMB | Shanghai Metal Exchange spot, 22 Oct 2026 |
| Rhodium powder spot | 2,220–2,270 RMB/g | Unchanged | Shanghai Metal Exchange spot, 22 Oct 2026 |
| Iridium powder spot | 2,400–2,430 RMB/g | +70 RMB | Shanghai Metal Exchange spot, 22 Oct 2026 |
The same pattern appeared in rare earths, where China Rare Earth Industry Association reference prices dated 21 October 2026 showed the group splitting rather than moving together:
| Oxide | Reference range | Direction |
|---|---|---|
| Praseodymium-neodymium oxide, above 99%, Nd2O3 75% | 728.8–748.8 RMB/kg | Lower |
| Terbium oxide | 6,335–6,395 RMB/kg | Lower |
| Dysprosium oxide | 1,395–1,435 RMB/kg | Unchanged |
| Holmium oxide and erbium oxide | — | Higher against the trend |
| Direction | What it covers | How a recycler experiences it |
|---|---|---|
| Closing weak links in key base materials | Recovery and refining of platinum-group metals, indium, germanium, gallium, rhenium | These are textbook base-process gaps, so capability-building attention is likely to concentrate here |
| Testing and standardisation | Scrap grade determination and settlement rules, long-standing friction points | Standard methods reduce disputes and shorten the gap between quotation and payment |
| Advantage for compliant operators | Source-level qualification and environmental permitting | Companies holding both are typically better placed on resource-comprehensive-utilisation treatment and project filings |
One honesty note: nothing in the published coverage describes money flowing directly to recyclers, and no entitlement exists until provincial implementing rules appear. Treat the third row as a direction of travel, not a cheque.
| Check | Pass condition | Failure mode |
|---|---|---|
| Qualification | Source-level smelting qualification plus valid environmental permits | Counterparty is a trading intermediary with no treatment route |
| Assay | Issues its own laboratory report or a recognised third-party one | Grades asserted verbally or inferred from the equipment label |
| Benchmark | Settlement linked to SMM or Shanghai Metal Exchange published quotes | An internal reference price that cannot be verified by the seller |
Liaocheng Feiyan New Material Technology Co., Ltd. applies this sequence to platinum-group scrap in PGM scrap sampling and assay, to thermocouple wire in platinum-rhodium wire recycling, to silver electrical contact recycling and to spent rhodium catalyst recycling. The full capability description sits in precious metal recycling capabilities, and the measurement methods in XRF analysis and material testing.
Source and disclaimer: the Shanghai Metals Market (SMM) midday review of 22 October 2026, Shanghai Metal Exchange spot rare and precious metal quotes of the same day, and China Rare Earth Industry Association reference prices dated 21 October 2026, together with publicly reported coverage of the Industrial Foundation Capability Enhancement Plan issued on 22 October 2026 by the Ministry of Industry and Information Technology and seven other departments. Policy content is summarised from publicly reported coverage of the plan and is provided for general information; entitlements, qualifications and funding routes depend on implementing rules to be issued by the relevant authorities and should be confirmed with them directly. Price figures are indicative and dated as shown, are stated for technical communication only, and are not a quotation, not investment advice and not a commitment. Actual settlement depends on mutually accepted assay results and the signed contract. Prepared by Liaocheng Feiyan New Material Technology Co., Ltd..
The plan, issued on 22 October 2026 by the Ministry of Industry and Information Technology together with seven other departments, sets industrial base upgrading as its main line and the industrial base re-engineering programme as its instrument, targeting weak links, extending strengths and positioning for frontier technologies. For recyclers the significance is that platinum-group metals, indium, germanium, gallium and rhenium refining capability falls squarely inside the weak-link category. Companies can expect attention on assay and settlement standardisation, plus a widening advantage for operators holding source-level smelting qualifications and environmental permits. Specific entitlements depend on implementing rules still to be issued by local authorities.
Nothing in the published coverage describes a direct subsidy to recyclers, and any claim to that effect should be treated as speculation. What the plan does is frame industrial base capability as national priority, which historically channels support through engineering projects, standards work and qualification-linked preferences such as resource-comprehensive-utilisation treatment. Companies are better advised to prepare documentation and monitor provincial implementing notices than to assume a grant.
Usually yes, but in tranches. On 22 October 2026 platinum futures fell 2.53%, palladium futures fell 3.88%, yet rhodium powder held flat and iridium powder rose 70 RMB per gram, so even within one basket the metals diverged. Material also degrades while it sits through oxidation and contamination. Locking the day's benchmark and shipping in batches beats either hoarding or a single clearing sale.
Three checks, and treat any one failure as disqualifying: does the counterparty hold source-level smelting qualification and environmental permits; does it issue its own or a third-party assay report; is the settlement price linked to a published benchmark such as Shanghai Metals Market or the Shanghai Metal Exchange spot quotes rather than to an internal number. A high quote from a counterparty that fails these checks is not a premium, it is risk.
The published tape for 22 October 2026 shows platinum 99.95% at 390-395 RMB per gram down 10 RMB and palladium powder at 250-255 RMB per gram down 9 RMB, while rhodium powder was unchanged at 2,220-2,270 RMB per gram and iridium powder rose 70 RMB to 2,400-2,430 RMB per gram. The divergence reflects different end-use exposure between autocatalyst and industrial demand rather than any single macroeconomic driver, which is why a basket quote for mixed PGM scrap is a poor way to price a lot.
The same logic applies, because rare earth separation and magnet recovery are industrial base technologies. Reference prices published by the China Rare Earth Industry Association on 21 October 2026 showed the group diverging rather than moving together: praseodymium-neodymium oxide above 99% at 728.8-748.8 RMB per kilogram and terbium oxide at 6,335-6,395 RMB per kilogram both lower, dysprosium oxide flat at 1,395-1,435 RMB per kilogram, while holmium and erbium oxides rose against the trend. Segregating by element group matters more than ever in that environment.
Liaocheng Feiyan New Material Technology Co., Ltd.
Address: Room 8-1503, 15F, Building 9, Xingguang International Financial Center, Dongchang East Road, Dongcheng Sub-district, Liaocheng Economic and Technological Development Area, Shandong, China
Tel: 0635-2112001 / 19963594228 | Email: fykj425@gmail.com
Copyright © Liaocheng Feiyan New Material Technology Co., Ltd.. All Rights Reserved.